Saturday, 16 May 2015

CROSSING THE ENGLISH CHANNEL, DESTINATION LEZARDRIEUX

We weighed anchor in Cawsand bay on the night of Tuesday 12 May, and heading out of the outer Plymouth harbour, past Eddiestone Rocks light house, on a bearing of 150 degrees. This would allow for tidal drift  as we crossed. Our destination was Lezardrieux in the Trieux river in North Brittany. We chose this as our first visit to France because it promised 'all tide access' and good shelter from the winds.
After a gruelling 16 hours we dropped anchor in the Trieux river just North of the marina of Lezardrieux.
It was certainly peaceful and rather beautiful..

Here are some pictures:

OUR AIS SYSTEM HELPED DURING THE CROSSING

Like a rabbit crossing a motorway... Ships everywhere. But our excellent AIS allowed us to see what their headings and speed was

Close but safe.!
THE TRIEUX RIVER (pictures taken while we were leaving on the 15th May)

view South (up river)

view seaward

little green yacht beside us at anchor


early morning.. bliss.!

CRUISING AGAIN 2015.


So we are now on the Brittany coast of France. The weather is good (some sunshine..) and we are settled down into a cruising rhythm.

We spent a month in Plymouth Mayflower marina waiting for our stern arch to be built. It was a busy time for the yachting industry in the area, because it was the Easter period and most "yachties" have this habit of getting boating fever as soon as Easter long weekend looms on the horizon. In addition lots of the workforce take their holidays.
Our arch was built by a Stainless steel metal works in Queen Annes Marina in East side of Plymouth. We had been speaking with them since summer last year, and had narrowed our options down to choosing them as the provider.
They required 4 weeks to make the arch so we booked into Mayflower marina for a month from the 18th March until the 18th April... On the 16th April had it fitted.
Soon after the installation we bought a wind turbine (generator) and solar panels.
In the meantime we had contracted a rigging company to build an inner stay so that we could use storm jib and inner staysails. Then just to be more extravagant we bought a spinnaker pole with related stowage track and hardware.
With all the extra work our stay in Mayflower ran into the month of May. In fact we didn't sail out of the marina until Saturday 9th May 2015...

THE STERN ARCH
Here are some pictures of our arch.
The famous stern arch enables us to have a wind generator, solar panels and some kind of dinghy lifting davits




THE WIND GENERATOR and SOLAR PANELS


REBUILT THE BIMINI TO FIT THE ARCH

We had to cut and resow the bimini so as to join the arch forward side.

NEW ROCNA ANCHOR (33KG !)

One of the best anchors available ..

NEW INNER FORE STAY WITH 'WICHARD' ADJUSTER

Extremely expensive bit of rigging.


COMPLETED THE WATER MAKER INSTALLATION

Pump and filters in the bilges and the unit itself under the settee bench

Including some detailed rework of leaking parts...

Wednesday, 18 March 2015

Dartmouth to Plymouth

On Wednesday morning at 09.00 hours we left the Dart river in glorious sunshine and headed out into the estuary and Start Bay. The tide and North Easterly wind swept us round Start Point and West towards Plymouth harbour. With the wind just in the right place we managed to sail right up to the east side of Drake island, then we motored gently to Barn Pool bay and dropped anchor at 14.00 hours. After contacting the Mayflower marina we were allocated berth E16 which was parallel to the pontoon, so we raised the anchor are serenely motored into place.

Blasting along at about 10 knots..

Clear but cold sunset from our berth in Mayflower marina

Mayflower is the home of Princess Yachts (fuel burners aka motor boats)

Famous Plymouth Hoe

This is for Scott of Antarctica.

View from the headland above Mayflower marina

Tuesday, 17 March 2015

Cruising West

We left Hamble Point marina on the 12th March on a blustery day and anchored in Studland bay just outside Poole harbour. Here we stayed two nights before taking refuge from the cold fierce wind in Poole harbour on a mooring in Witch channel for the night of the 14th March. On the 15th we caught the tide for the long journey West to Dartmouth. The weather forecast had strong wind warnings although the met office showed moderate 20knot winds. Anyway the cruise was successful and we arrived in Dartmouth and spent two lovely days moored on the deep water visitors pontoon.










Tuesday, 10 March 2015

IN THE WATER

So we are now in the water again, ready for a full year of cruising.
The launch happened on the 7th as scheduled. We finished the last bits of anti foul painting while in the sling (overnight 6th March).
The engine started first thing with a little bit of smoke. This is normal after a long period of inactivity and an oil change. Our son Miles assisted fending off as we left the very tight launch bay and parked her on X pontoon in Hamble Point marina.






Monday, 23 February 2015

RELAUNCH for 2015

After 5 months ashore Kwanza is being prepared for her launch which is planned for the 7th March.
We have already added two coats of new Anti foul paint to her hull, and have to do some detailed cleaning and coating of the bow-thruster and the drive system (propeller).
The deck and top sides will be washed. All metalwork cleaned and oiled, the engine and generator put back into service, and all systems tested.
There is also the water maker installation to complete.
Then after launch we will get a visit from the manufacturer's engineer who will test and hopefully repair the drive system known as 'dock and go'.


New Antifoul paint.!


Thursday, 9 October 2014

Gosport to Hamble. Final trip for winter lay-up

Having done our research on best options for laying up the yacht for winter, we chose Hamble Point Marina located at the mouth of the Hamble river in Southampton. Many of the marina deals were expensive and had add-ons such as hire of cradle etc.
Generally the costs involve about 300£ for lift out, 100£ for the wash and 300£ for re-launch. The actual shore side storage amounts to about 1,800£ for five months. (14.6 m yacht)
So on the 1st October we motored from Gosport Haslar marina up the Southampton waters to Hamble where we moored on the visitors pontoon just in front of the marina. Although our appointment was for 13.00 local time they actually lifted us at about 11.30. From the sling they put the yacht into a flat bed motorised trolley and took her to the designated position right beside the water overlooking the river.




In the transporter trolley

Our view from the cockpit

Looking up the river

Parked along the grass behind madam