Monday, 23 February 2015

RELAUNCH for 2015

After 5 months ashore Kwanza is being prepared for her launch which is planned for the 7th March.
We have already added two coats of new Anti foul paint to her hull, and have to do some detailed cleaning and coating of the bow-thruster and the drive system (propeller).
The deck and top sides will be washed. All metalwork cleaned and oiled, the engine and generator put back into service, and all systems tested.
There is also the water maker installation to complete.
Then after launch we will get a visit from the manufacturer's engineer who will test and hopefully repair the drive system known as 'dock and go'.


New Antifoul paint.!